Ask what the minimum applies to
Ask the supplier to write the quantity and unit beside the grouping rule. A quote might distinguish the whole purchase order, one artwork file, one size, one production configuration or a separate retail pack. Ask whether a logo change, different background colour or barcode changes the grouping.
Record where the rule came from, the quote revision and the date. A sample allowance, blank-stock order or print test can have its own terms. Confirm the condition attached to the batch you intend to buy.
Run both checks on the same schedule
Illustrative example: the supplier confirms a 500-pad order minimum and 250 pads per artwork, with matching construction and packing. Three design rows of 300, 180 and 120 make 600 pads. The order-level check passes. The 180 and 120 rows need resolution before you can approve the proposed mix.
Keep any pending art approval separate from the commercial minimum. A row can meet its MOQ while its proof remains open. Use the design quantity splitter to share the order total and distinguish artwork-ready from pending quantities.
Compare the available responses
Ask whether a smaller variant can be quoted as a proof, a permitted short run, or as part of the same artwork and packing configuration. If you propose an increase, compare units you expect to use with the extra spend, packing and storage. Consider deferring one design if its release date is flexible.
Before approving the order, obtain a revised quote showing accepted quantities, any setup fee or short-run surcharge, proof coverage, packing and milestone dates. Keep the proposed split attached to the quote comparison.
Illustrative MOQ worksheet
| Group | Planned | Supplier rule in this example | Decision |
|---|---|---|---|
| Combined order | 600 | 500 per order | Pass on combined quantity |
| Design A | 300 | 250 per artwork | Pass, pending usual sample and proof approval |
| Design B | 180 | 250 per artwork | Below minimum by 70 |
| Design C | 120 | 250 per artwork | Below minimum by 130 |
Frequently asked questions
What is Newlane’s minimum for my mouse pad?
Send the proposed construction, artwork quantities and packing. Ask for the minimum and the grouping rule in the project quote.
Can I add blank pads to reach the minimum?
Ask the supplier whether blank and printed pads count together for the quoted construction and print run. Record the answer in the revised quote.
Do sample quantities count toward MOQ?
Ask how the sample is invoiced and whether those units are credited or included in the production total. Sample and production terms are often quoted separately.