Enter each design and quantity
Use one row per design, including pending artwork. Mark a revision approved only after the buyer signs it off.
Results
Give each design a separate row
Enter a distinct row ID for each design and packing variant. If the same design uses two packing labels with separate quantities, use IDs such as A-retail and A-bulk and keep the same artwork revision on both rows.
Separate plan and approval quantities
Use non-negative whole numbers and include at least one positive quantity. Keep a row with incomplete artwork in the plan, with its approval unchecked. For approved artwork, record the actual revision so the totals are traceable.
Check a confirmed minimum
Enter a minimum and its source only if the supplier confirmed that it applies to that row. For a minimum that applies to several rows or to the entire order, add the relevant quantities and compare the combined total separately.
Worked quantity summary
| Design | Plan | Artwork status |
|---|---|---|
| A | 400 | Approved |
| B | 350 | Approved |
| C | 250 | Pending |
| Totals | 1,000 planned | 750 approved artwork, 250 pending |
Frequently asked questions
Can a design with no approved file be included?
It can remain in planning, but the output must flag it as unapproved and exclude it from production release.
Can percentages replace exact quantities?
Use percentages for planning only; confirm integer quantities per design before quotation approval and production.