Capture the delivery condition
Before unpacking, photograph the carton, label, pack orientation and visible damage. Record the lot and carton numbers. Photograph the first laid-out condition and mark the curl direction, crease or affected corners. Keep the original packaging and at least one affected sample for review.
Compare flatness at agreed times
Use the agreed unpacking and conditioning instructions. Lay the pad on the agreed flat reference and record which points lift, the observation times and the conditions. Where the parties have a method, record measured lift and its units using the same positions. Avoid introducing unapproved heat or force.
Describe lift and damage independently. A raised corner can be compared at agreed checkpoints, while a crease, chipped edge or print damage needs its own location, photo and functional observation. Use the buyer's agreed criterion to judge each item, even if the pad later lies flatter.
Agree disposition against the reference
Compare with the approved packing and retained sample under the same method. Record whether the issue remained, improved or affected function. Ask the supplier to review the lot and packaging before the buyer accepts, separates or seeks replacement for affected units.
Curled pad arrival record
| Check | Record |
|---|---|
| Package | Lot, carton label, packing direction and unopened photos. |
| First opening | Curl direction, edge or crease location, and sample ID. |
| Flatness checks | Reference surface, conditions, time points and lift with units if measured. |
| Disposition | Reference comparison, supplier response and buyer decision. |
Frequently asked questions
How long should flattening take?
Use the agreed product-specific inspection window; this plan does not promise a standard recovery time.
Should I hide the issue under a keyboard?
No. Record the received condition and assess whether the product meets the agreed requirements.